Course overview
Construction projects rarely fail for lack of engineering. They slip because the schedule was never sequenced against real resource limits, the budget was tracked in a spreadsheet that told nobody about a cost overrun until it was too late, and coordination on site broke down between trades. This course puts the control systems and the leadership habits that hold a project together at the center of the work, from the first work breakdown structure through earned-value reporting to the conversation that resolves a clash between a subcontractor and the site team.
Across seven units you move from planning fundamentals to the day-to-day discipline of running a live site. You will build schedules with the critical path method, develop and monitor budgets, apply cost variance and earned value to catch slippage early, coordinate labor, materials, and equipment, and lead diverse teams through the pressures of delivery. Because uncertainty sits at the heart of every construction schedule, the course connects directly to structured risk management in complex projects, so contingency and float are planned deliberately, not discovered late.
Why this matters
On most construction contracts the margin is thin and the penalties for late completion are real. Liquidated damages, retention held against defects, and cash flow squeezed by slow progress claims all trace back to how well the project is planned and controlled. A manager who can read an earned-value report knows within the first quarter whether the job is trending toward a loss, while one relying on percent-complete guesses finds out at handover. The methods here, work breakdown structures, the critical path method, Gantt-based sequencing, and earned-value control, are the shared language of quantity surveyors, planners, and clients across the industry, and fluency in them is what separates a coordinator from a project manager.
Course objectives
Concretely, you will be able to:
- Weigh stakeholder interests against cost, schedule, and scope.
- Turn drawings into a work breakdown structure and schedule.
- Sequence project activities to protect the finish date.
- Forecast the final cost from earned-value performance indices.
- Coordinate trades and deliveries to keep site work flowing.
- Score construction risks and assign mitigation owners.
- Uphold QA/QC discipline against non-conformance.
- Negotiate contracts and disputes through the documented process.
- Motivate a multi-trade crew toward measurable progress.
- Resolve site conflicts before they stall the schedule.
Course outline
Unit 1: Foundations of construction project management
- The project life cycle from feasibility to handover.
- The project manager's role across the delivery chain.
- The iron triangle of time, cost, quality, and scope.
- Mapping stakeholders from funder to foreman to authority.
Unit 2: Planning and scheduling with WBS and the critical path method
- Decomposing a construction scope into work packages.
- Applying the critical path method to find total float.
- Using Gantt charts, Primavera P6, and Microsoft Project.
- Resource planning, leveling, and sequencing for crews.
Unit 3: Cost estimation and earned-value control
- Building a cost estimate with unit rates and contingency.
- Developing a baseline budget and cash flow curve.
- Applying earned value across cost and schedule indices.
- Reading cost variance to forecast estimate at completion.
Unit 4: Site coordination and resource management
- Managing daily labor, plant, and material deliveries.
- Coordinating trades via look-ahead schedules.
- Site safety through permits to work and method statements.
- Facilitated discussion of site communication under pressure.
Unit 5: Risk and quality management on construction projects
- Construction risk register with likelihood and impact scores.
- Choosing mitigation responses with owners and contingency.
- QA/QC through inspection and test plans.
- Embedding safety and sustainability into delivery.
Unit 6: Contracts and procurement in construction
- Common contract forms under FIDIC and NEC.
- Procurement routes, tendering, and vendor management.
- Legal compliance through insurance, bonds, and approvals.
- Dispute resolution through adjudication and arbitration.
Unit 7: Leadership and team management on site
- Leading multi-trade teams across cultures and languages.
- Motivation and performance management for site targets.
- Conflict resolution on site through documented disputes.
- Building habits in delegation and decision-making.
How the course is delivered
The training is delivered via facilitated lectures, guided walkthroughs of documented projects, annotated case files, and group problem-solving that connect each control method to a realistic construction context. Delivered for learning purposes, the material is not a substitute for professional engineering or legal advice on any specific contract or project.
Who should attend
Construction project managers, site supervisors, and coordinators are the core audience, together with planners, quantity surveyors, engineers moving into delivery roles, and client-side representatives who need to read a schedule and a cost report with confidence and hold contractors to account.
About EuroQuest International Training
Since its establishment in 2015, EuroQuest International Training has built a portfolio exceeding 1,000 titles and taught more than 15,000 delegates worldwide. The organization is headquartered in Bratislava, Slovakia, and convenes courses in Dubai, London, Istanbul, Paris, Vienna, Barcelona, and Geneva. Instructors bring site-level construction and controls backgrounds to the classroom.
That practitioner grounding keeps the content anchored to how projects are really planned, tracked, and delivered.
Frequently asked questions
Is a certificate provided at the end of the training?
Delegates who finish the course are awarded a Certificate of Completion from EuroQuest International Training, noting the subjects studied and days attended. The document records participation, not a legal qualification or a chartered credential.
What scheduling methods will I learn to use?
The course works through work breakdown structures, the critical path method, and Gantt-based sequencing, with worked examples showing how each drives a realistic construction schedule.
Is earned value analysis included?
Yes. Cost variance and earned value are covered as core controls, with documented figures illustrating how they flag budget and schedule slippage early.
Related courses
To broaden your construction management toolkit, consider these related courses:
- Cost Control and Budgeting in Engineering Projects to sharpen budgeting discipline and financial reporting.
- Construction Engineering and Project Delivery covering EPC and delivery-model choices across the project chain.
- Project Management for Engineers and Technicians for practitioners applying core PM methods to technical work.
- Health and Safety Management in Construction for the safety and compliance side of site delivery.